News and Press

News and Press

Does S²A Modular have certified installers and authorized builders?

June 30, 2020
modular home builder

Yes, S2A Modular has a certification course for all installers of our products. This eliminates mistakes, minimizes delays and ensures quality control of all installations from start to finish. We have similar requirements for all S2A Modular authorized builders. We...

Read More

What is an Opportunity Zone?

June 30, 2020
modular home builder

The S2A Opportunity Zone was established to enable S2A to drive its own business and utilize the technology we are creating to bring our vision into the mainstream. We have two primary directions where the S2A Opportunity Zone fund will...

Read More

Are modular homes different from a mobile home trailer or manufactured home?

June 30, 2020
modular home builder

Yes, a modular home is not a mobile home; it is simply a home that is built off-site, as opposed to on-site. These homes are often called factory-built, system-built or prefab (short for prefabricated) homes. Modular and manufactured homes are not the same. Manufactured homes are not placed on permanent foundations. Modular...

Read More

Where are the S²A Mega Factories located?

June 30, 2020
modular home builder

S2A Modular has two MegaFactories set to be in production by Quarter 4 of 2020. MegaFactories in Patterson and Hemet, California are being built as we speak. The next round of MegaFactories is currently in the planning phase and the...

Read More

How are S²A Modular homes transported and what size are they?

June 30, 2020
modular home builder

S²A Modular produces complete structures in parts called “modules” that are on average, 16-feet wide (including overhangs and the protective wrap) and approximately 74 feet long. Modules can be “cut” in half to accommodate specific route limitations such as sharp...

Read More

How do I choose a lot?

June 30, 2020
modular home builder
Read More

What types of homes and buildings does S²A Modular Build?

June 30, 2020
modular home builder
Read More

What is a feasibility study and how long does it take?

June 30, 2020
modular home builder

A Development Feasibility Study and Conceptual Budget {DFSCB} is the first step in the modular home build process, and it is designed to protect the customer and the builder. The study helps both parties gain a complete understanding of everything...

Read More

How does the build process work and how long before I can move in?

June 30, 2020
modular home builder

The process of building an S²A Modular property contains several steps which begin with a development feasibility study and over the course of the next 6-8 months, a variety of different actions are completed until the site work is complete...

Read More

Do you have financing available?

June 30, 2020
modular home builder

Yes, S2A Modular has partnered with some of the top modular lending institutions in the country to help simplify the build process and to provide special incentives to buyers who have other financial obligations to handle during the construction and...

Read More